Skip to content
Crtanje Kuhinja — KROJ
← All instructions

Blind corner cabinet

Blind section in the corner and an upright rail that carries the door hinges.

Example 1000 × 720 × 550 mm - the same order applies to every width.

Blind corner cabinet: assembly instructions

  1. 1

    Before you start

    Lay cardboard or a blanket on the floor so the panels don't get scratched. Check against the list that you have every panel - labels match the stickers and the cutting list - and all the hardware. The edge-banded edge is the front: always face it forward.

  2. 2

    Left side and bottom

    Stand the left side on its edge, drilled face inwards. The bottom sits BETWEEN the sides, flush with the lower and front edge of the side (P1 and P2). Drive 3 confirmat screws through the holes in the side - middle one first, then the ends. Don't fully tighten until the carcass is assembled.

  3. 3

    Rails

    The front and back rails (P3 and P4) go on top of the side: front rail at the front edge, back rail at the back edge, flush with the top. They join the left side with 2 confirmat screws.

  4. 4

    Right side closes the carcass

    Lower the right side P1 onto the free ends of the panels already fixed in the left side. Drive 5 confirmat screws through the right side, and only now tighten every confirmat fully.

  5. 5

    Diagonals and back panel

    Lay the carcass face down and measure both diagonals - they must match within 1 mm. Only then place the back panel P5 smooth face in, 2 mm in from the edges, and pin or staple it every 8-10 cm into the sides, bottom and rails (about 32). Once the back is on, the carcass can't rack.

  6. 6

    Corner rail

    The corner rail P7 stands upright by the door opening: half its width inside the carcass, half sticking out front - the neighbouring cabinet joins to that part. Fix it with screws through the bottom and front rail. The corner door hinge plates go on it.

  7. 7

    Legs

    Lay the carcass on its back and fix 6 legs to the bottom, 4-5 cm from the edges. Set them to plinth height (100 mm) - final levelling is done with a spirit level once the cabinet is in place.

  8. 8

    Supports and shelves

    Press the supports into the holes in the sides - 4 pcs, 4 per shelf, at the same height left and right. The shelf P6 rests on them, banded edge forward. Height can be changed later by moving the supports.

  9. 9

    Hinges and doors

    Press the hinges (2 pcs) into the Ø35 cups in the door and fix each with two screws. Screw the plates to the side at the same height as the hinges. Clip the door onto the plates.

  10. 10

    Handles

    Fix the handles (1) with M4 screws through the front from inside. Drill with a template and a scrap board behind the front so the face doesn't chip.

  11. 11

    Adjustment

    Adjust the fronts: 3-4 mm gaps, edges in line with the neighbours. A hinge has three screws - side, height and depth.

  12. 12

    Plinth

    The plinth clips onto the legs - last, once the whole kitchen is in place and levelled.

The instructions are made by the same program that makes the cutting list - panels carry the same labels (P1, P2…) and the same number of screws and hinges as the hardware list.

Design your kitchen

With an order you get a cutting list with the same labels and a PDF guide for the whole kitchen.

Design your kitchen