Zum Inhalt springen
Crtanje Kuhinja — KROJ
← All instructions

Sink unit

Rails on edge to leave room for the bowl and trap, two doors.

Example 800 × 720 × 560 mm - the same order applies to every width.

Sink unit: assembly instructions

  1. 1

    Before you start

    Lay cardboard or a blanket on the floor so the panels don't get scratched. Check against the list that you have every panel - labels match the stickers and the cutting list - and all the hardware. The edge-banded edge is the front: always face it forward.

  2. 2

    Left side and bottom

    Stand the left side on its edge, drilled face inwards. The bottom sits BETWEEN the sides, flush with the lower and front edge of the side (P1, P2 and P7). The lower back rail stands on edge along the back of the bottom - the sink trap passes in front of it. Drive 4 confirmat screws through the holes in the side - middle one first, then the ends. Don't fully tighten until the carcass is assembled.

  3. 3

    Rails

    On a sink unit the rails P3 and P4 stand on edge (upright) at the front and back, to leave room for the bowl. They join the left side with 2 confirmat screws.

  4. 4

    Right side closes the carcass

    Lower the right side P1 onto the free ends of the panels already fixed in the left side. Drive 6 confirmat screws through the right side, and only now tighten every confirmat fully.

  5. 5

    Diagonals and back panel

    Lay the carcass face down and measure both diagonals - they must match within 1 mm. Only then place the back panel P5 smooth face in, 2 mm in from the edges, and pin or staple it every 8-10 cm into the sides, bottom and rails (about 35). Once the back is on, the carcass can't rack.

  6. 6

    Legs

    Lay the carcass on its back and fix 4 legs to the bottom, 4-5 cm from the edges. Set them to plinth height (100 mm) - final levelling is done with a spirit level once the cabinet is in place.

  7. 7

    Supports and shelves

    Press the supports into the holes in the sides - 4 pcs, 4 per shelf, at the same height left and right. The shelf P6 rests on them, banded edge forward. Height can be changed later by moving the supports.

  8. 8

    Hinges and doors

    Press the hinges (4 pcs) into the Ø35 cups in the doors and fix each with two screws. Screw the plates to the side at the same height as the hinges. Clip the doors onto the plates.

  9. 9

    Handles

    Fix the handles (2) with M4 screws through the front from inside. Drill with a template and a scrap board behind the front so the face doesn't chip.

  10. 10

    Adjustment

    Adjust the fronts: 3-4 mm gaps, edges in line with the neighbours. A hinge has three screws - side, height and depth.

  11. 11

    Worktop and sink

    The worktop goes on once all base cabinets are placed and levelled. The sink cut-out follows the template from the sink's box, its edge is sealed with silicone, and the sink and tap are fitted from above.

  12. 12

    Plinth

    The plinth clips onto the legs - last, once the whole kitchen is in place and levelled.

The instructions are made by the same program that makes the cutting list - panels carry the same labels (P1, P2…) and the same number of screws and hinges as the hardware list.

Design your kitchen

With an order you get a cutting list with the same labels and a PDF guide for the whole kitchen.

Design your kitchen