Drawer unit - chipboard boxes, side runners
Three drawers with chipboard boxes on GTV side runners.
Example 600 × 720 × 560 mm - the same order applies to every width.
Drawer unit - chipboard boxes, side runners: assembly instructions
- 1
Before you start
Lay cardboard or a blanket on the floor so the panels don't get scratched. Check against the list that you have every panel - labels match the stickers and the cutting list - and all the hardware. The edge-banded edge is the front: always face it forward.
- 2
Left side and bottom
Stand the left side on its edge, drilled face inwards. The bottom sits BETWEEN the sides, flush with the lower and front edge of the side (P1 and P2). Drive 3 confirmat screws through the holes in the side - middle one first, then the ends. Don't fully tighten until the carcass is assembled.
- 3
Rails
The front and back rails (P3 and P4) go on top of the side: front rail at the front edge, back rail at the back edge, flush with the top. They join the left side with 2 confirmat screws.
- 4
Right side closes the carcass
Lower the right side P1 onto the free ends of the panels already fixed in the left side. Drive 5 confirmat screws through the right side, and only now tighten every confirmat fully.
- 5
Diagonals and back panel
Lay the carcass face down and measure both diagonals - they must match within 1 mm. Only then place the back panel P5 smooth face in, 2 mm in from the edges, and pin or staple it every 8-10 cm into the sides, bottom and rails (about 24). Once the back is on, the carcass can't rack.
- 6
Legs
Lay the carcass on its back and fix 4 legs to the bottom, 4-5 cm from the edges. Set them to plinth height (100 mm) - final levelling is done with a spirit level once the cabinet is in place.
- 7
Runners
Fix the runners (3 pairs) to the sides as the maker's instructions say - heights measured from the bottom, front end 2-3 mm back from the edge of the side. Left and right runner of one drawer must be at the same height. Bottom edge of each drawer box, measured from the inside of the cabinet bottom: drawer 1 5 mm, drawer 2 283 mm, drawer 3 571 mm (bottom to top). Fix the runner so the box sits exactly there - how far the runner sits below or above the box edge is in the maker's instructions.
- 8
Drawer boxes
Assemble 3 boxes: drawer sides, front and back and bottom (P6, P7, P8, P6a and P7a). Check the box is square, then put it on the runners and push it all the way - it must slide without catching.
- 9
Drawer fronts
Fix the fronts F1 and F2 to the front of the boxes: one screw from inside first, check the 3-4 mm gap to the neighbour, then the rest.
- 10
Handles
Fix the handles (3) with M4 screws through the front from inside. Drill with a template and a scrap board behind the front so the face doesn't chip.
- 11
Adjustment
Adjust the fronts: 3-4 mm gaps, edges in line with the neighbours. A drawer front is adjusted on the box.
- 12
Plinth
The plinth clips onto the legs - last, once the whole kitchen is in place and levelled.
The instructions are made by the same program that makes the cutting list - panels carry the same labels (P1, P2…) and the same number of screws and hinges as the hardware list.
Design your kitchen
With an order you get a cutting list with the same labels and a PDF guide for the whole kitchen.
Design your kitchen